Inserting the brackets into the loading rail

– Insert bracket 1 into the center of loading

– Insert bracket 1 into the center of loading rail 4.
– Press release button 2 and push bracket 1 into the desired position in loading rail 4.
– Let go of release button 2.
– Press locking button 3.
Bracket 1 is locked in loading rail 4.
– If necessary, fold cargo tie-down ring 5 upwards.

Distribute the load on the cargo tie down rings WARNING
Distribute the load on the cargo tie down rings evenly.
Otherwise, vehicle occupants could be injured by objects being thrown around if you:
- brake sharply
- change direction suddenly
- are involved in an accident
Please observe the loading guidelines.

    See also:

    Playback options
    The following options are available: • Normal Track Sequence Normal track sequence: you hear the tracks in their normal order (e.g. numerical or alphabetical). • Random Tracks All the trac ...

    Styling
    The 2012 M-Class retains many of the previous generation's styling cues, like a wide front grille and forward-swept C-pillars, but the new design looks more substantial and imposing. Contributing ...

    Showing/hiding the picture
    To hide the picture: select Display OFF in the system menu using the buttons on the remote control and press the button to confirm. The picture is hidden. To display the picture: press the ...