Inserting the brackets into the loading rail

– Insert bracket 1 into the center of loading

– Insert bracket 1 into the center of loading rail 4.
– Press release button 2 and push bracket 1 into the desired position in loading rail 4.
– Let go of release button 2.
– Press locking button 3.
Bracket 1 is locked in loading rail 4.
– If necessary, fold cargo tie-down ring 5 upwards.

Distribute the load on the cargo tie down rings WARNING
Distribute the load on the cargo tie down rings evenly.
Otherwise, vehicle occupants could be injured by objects being thrown around if you:
- brake sharply
- change direction suddenly
- are involved in an accident
Please observe the loading guidelines.

    See also:

    The Inside
    The GL's cabin is finished in nice materials — that's the price of entry in this class — but the interior design isn't especially memorable. Fit and finish are also good. Ranking as one of the m ...

    Deleting a destination or the home address from the destination memory
    To activate navigation mode: press the function button once or twice. To show the menu: press the COMAND controller. Select Destination in the navigation system menu bar by turning t ...

    Cleaning the sensors
    •► Clean sensors 1 of the driving systems with water, car shampoo and a soft cloth. When cleaning the sensors with a power washer, maintain a distance between the vehicle and the nozzle ...