Inserting the brackets into the loading rail

– Insert bracket 1 into the center of loading
rail 4.
– Press release button 2 and push
bracket 1 into the desired position in
loading rail 4.
– Let go of release button 2.
– Press locking button 3.
Bracket 1 is locked in loading rail 4.
– If necessary, fold cargo tie-down ring 5
upwards.
WARNING
Distribute the load on the cargo tie down rings
evenly.
Otherwise, vehicle occupants could be
injured by objects being thrown around if you:
- brake sharply
- change direction suddenly
- are involved in an accident
Please observe the loading guidelines.
See also:
The Inside
The GL's cabin is finished in nice materials — that's the price of entry in
this class — but the interior design isn't especially memorable. Fit and finish
are also good.
Ranking as one of the m ...
Deleting a destination or the home address from the destination memory
To activate navigation mode: press the
function button once or twice.
To show the menu: press
the COMAND
controller.
Select Destination in the navigation
system menu bar by turning
t ...
Cleaning the sensors
•► Clean sensors 1 of the driving systems
with water, car shampoo and a soft cloth.
When cleaning the sensors with a power
washer, maintain a distance between the
vehicle and the nozzle ...
