Inserting the brackets into the loading rail

– Insert bracket 1 into the center of loading

– Insert bracket 1 into the center of loading rail 4.
– Press release button 2 and push bracket 1 into the desired position in loading rail 4.
– Let go of release button 2.
– Press locking button 3.
Bracket 1 is locked in loading rail 4.
– If necessary, fold cargo tie-down ring 5 upwards.

Distribute the load on the cargo tie down rings WARNING
Distribute the load on the cargo tie down rings evenly.
Otherwise, vehicle occupants could be injured by objects being thrown around if you:
- brake sharply
- change direction suddenly
- are involved in an accident
Please observe the loading guidelines.

    See also:

    SmartKey
    SmartKey 0 To remove the SmartKey Vehicles with automatic transmission: shift the transmission to position P 1 Power supply for some consumers, such as the windshield wipers 2 Ignition (power su ...

    Brake fluid level
    If you notice that the brake fluid level in the brake fluid reservoir has fallen to the MIN mark or less, check the brake system immediately for leaks. Also check the thickness of the brake l ...

    AMG displays
    Press or on the steering wheel to select the AMG menu. 1 Gear indicator 2 Upshift indicator 3 Engine oil temperature 4 Coolant temperature Upshift indicator UP 2 indicates that the ...