Inserting the brackets into the loading rail

– Insert bracket 1 into the center of loading

– Insert bracket 1 into the center of loading rail 4.
– Press release button 2 and push bracket 1 into the desired position in loading rail 4.
– Let go of release button 2.
– Press locking button 3.
Bracket 1 is locked in loading rail 4.
– If necessary, fold cargo tie-down ring 5 upwards.

Distribute the load on the cargo tie down rings WARNING
Distribute the load on the cargo tie down rings evenly.
Otherwise, vehicle occupants could be injured by objects being thrown around if you:
- brake sharply
- change direction suddenly
- are involved in an accident
Please observe the loading guidelines.

    See also:

    System self-test
    After you have switched on the ignition, the system carries out a self-diagnosis. WARNING A malfunction in the system has been detected if one of the following conditions occurs: the indi ...

    Notes on using 3-zone automatic climate control
    The following contains notes and recommendations on optimum operation of automatic climate control. - Activate climate control using the and buttons. The indicator lamps in the and butt ...

    Parcel nets
    WARNING   Vehicles with Occupant Classification System (OCS) Do not place objects with a combined weight of more than 4.4 lbs (2 kg) into the parcel net on the back of the front passeng ...