Inserting the brackets into the loading rail

– Insert bracket 1 into the center of loading
rail 4.
– Press release button 2 and push
bracket 1 into the desired position in
loading rail 4.
– Let go of release button 2.
– Press locking button 3.
Bracket 1 is locked in loading rail 4.
– If necessary, fold cargo tie-down ring 5
upwards.
WARNING
Distribute the load on the cargo tie down rings
evenly.
Otherwise, vehicle occupants could be
injured by objects being thrown around if you:
- brake sharply
- change direction suddenly
- are involved in an accident
Please observe the loading guidelines.
See also:
First-aid kit
► Open the tailgate.
► To open the side trim panel: turn
rotary
knob 1 90° in the direction of the arrow
and open side trim panel 2.
► To remove the first-aid kit: remove
...
Tire pressure
This is pressure inside the tire applying an
outward force to each square inch of the tire's
surface. The tire pressure is specified in
pounds per square inch (psi), in kilopascal
(kPa) or in ...
The first 1000 miles (1500 km)
The more you look after the engine when it is new, the more satisfied you will
be with its performance in the future.
Drive at varying vehicle speeds and engine speeds for the first 1000 miles
...
