Inserting the brackets into the loading rail

– Insert bracket 1 into the center of loading

– Insert bracket 1 into the center of loading rail 4.
– Press release button 2 and push bracket 1 into the desired position in loading rail 4.
– Let go of release button 2.
– Press locking button 3.
Bracket 1 is locked in loading rail 4.
– If necessary, fold cargo tie-down ring 5 upwards.

Distribute the load on the cargo tie down rings WARNING
Distribute the load on the cargo tie down rings evenly.
Otherwise, vehicle occupants could be injured by objects being thrown around if you:
- brake sharply
- change direction suddenly
- are involved in an accident
Please observe the loading guidelines.

    See also:

    General notes
    The Active Driving Assistance package consists of DISTRONIC PLUS (Y page 169), Active Blind Spot Assist (Y page 202) and Active Lane Keeping Assist (Y page 205). ...

    Service and literature
    Your vehicle is covered under the terms of the warranties printed in the Service and Warranty Information booklet. Your authorized Mercedes-Benz Center will exchange or repair any defective parts ...

    AMG vehicles with rear axle locking differential
    Your vehicle is equipped with a self-locking differential on the rear axle. For better protection of the differential on the rear axle, carry out an oil change after a breaking-in phase of 200 ...